Select your language

ELECTRICAL INSTALLATIONS STUDY

Image
Our office, having been equipped with suitable and certified measuring instruments, undertakes the granting of the new Responsible Declaration of the Electrician Installer, for its submission to PPC.

This Responsible Statement includes:
complete set of electrical drawings
Installation control protocol according to KEHE or Standard HD 384
Delivery report of the electrical installation.
All of the above is delivered to you after an installation check, which includes:
  • Visual inspection
  • Full impression on a drawing
  • Checking – measuring the continuity of protective conductors (Pe)
  • Measurement of insulation resistance of conductors
  • Measurement of the earthing resistance of the property
  • Measuring the escape relay
  • Measurement of the error loop, if provided
  • Detecting cables inside walls
ngl-group-logo-gr.png
Innovation starts with a dream and a plan.
Our goal is its implementation

Contact Us

Mail To : info@nglgroup.gr
Call To : 2821020116
Find Us : Mavrogianni 3, 73133, Chania
Image